South Korea’s K-Test Breaks Ground on RM205mil Perak Plant, Its First in Southeast Asia
- South Korean semiconductor testing specialist K-Test Co Ltd has broken ground on a US$50mil (RM205mil) plant in Perak — the group’s first manufacturing facility in Southeast Asia.
- Run by wholly owned K-Test Malaysia Sdn Bhd, the plant will provide wafer and final testing for memory, system and power semiconductors, creating about 100 jobs.
- Practical completion is targeted by 28 February 2027, with operations to follow equipment installation and customer qualification.
- Perak is positioning itself as the northern region’s next chip node — Malaysia already holds about 13% of the global chip assembly, testing and packaging market.
South Korea-based semiconductor testing specialist K-Test Co Ltd has broken ground on a US$50mil (RM205mil) manufacturing facility in Perak — the group’s first plant in Southeast Asia — as it expands its global footprint to meet growing customer demand.
The facility, announced on 30 July 2026, will be operated by wholly owned subsidiary K-Test Malaysia Sdn Bhd and will provide wafer and final testing services for memory, system and power semiconductors. The project is expected to create about 100 jobs on completion, with knowledge transfer to local talent.
Based on a clean-room construction contract previously awarded by K-Test Malaysia, practical completion is targeted by 28 February 2027, paving the way for operations after equipment installation and customer qualification.
Perak steps out of Penang’s shadow
The groundbreaking was officiated by Perak executive councillor for tourism, industry, investment and corridor development Loh Sze Yee, joined by InvestPerak acting CEO Dr Ahmad Shahir Abdul Aziz, Mida Perak director Dyrul Syahrytz Mohd Daud and K-Test Malaysia CEO Brandon Lee.
Loh said the investment reflects K-Test’s confidence in Perak’s long-term proposition and Malaysia’s manufacturing ecosystem, citing the state’s cost advantages, infrastructure, government support and talent pool.
Ahmad Shahir was more pointed: "While Penang and Kulim continue to hog the limelight as Malaysia’s semiconductor powerhouses, Perak has been quietly building up its own position in the northern region’s chip supply chain." He said Perak is well positioned to take a larger role in Malaysia’s semiconductor and E&E growth story through its downstream strengths in packaging and testing.
The context supports him: Malaysia captures about 13% of the global market in chip assembly, testing and packaging (ATP) and ranks as the world’s sixth-largest semiconductor exporter. The ATP footprint that made Penang the "Silicon Valley of the East" has been spreading — into Selangor, and now Perak, the large state sitting between the two.
Setting up a factory or plant? Buying / selling industrial property or land in Malaysia? Reach out to Scott now.
Related news
Cnergenz slides 15% intraday before recovering to RM1.05
Cnergenz fell to 88 sen and Bursa halted short-selling on 16 Nov before it closed at RM1.05. Its 130,000 sq ft Penang Science Park North plant is due 2027-28.
TT Vision wins RM15.32m order, RM28.4m since September
Penang's TT Vision won a RM15.32m order for optical inspection machines, its third since September, and signed the RM92m contract for its Bayan Lepas plant.
Mitsui Kinzoku plans RM4.87b copper foil plant in Malaysia
Japan's Mitsui Kinzoku approved about ¥190bn (RM4.87bn) for a new copper foil plant beside its Shah Alam factory, for AI servers and chips, from April 2031.
